Sheets, mud, tape and screws for one room. The material people forget is the mud — one bucket does not go as far as it looks.

— sheets
Board area
— ft²
Joint compound
—
Tape
—
Screws
—

How the calculation works

walls = 2 × (length + width) × height

Subtract 21 ft² per door and 15 ft² per window, add the ceiling, apply waste, divide by the sheet area.

sheets = area × (1 + waste) ÷ sheet ft²

Consumables use the standard trade ratios: 0.009 gal of compound per ft² of board (a 4.5 gal bucket covers roughly 500 ft² over three coats), tape at 1 ft per 2 ft², and 32 screws per 4 × 8 sheet.

Worked example

12 × 10 ft room, 8 ft walls: perimeter 44 ft × 8 = 352 ft². One door and two windows remove 51 ft², leaving 301 ft². Ceiling adds 120 ft² → 421 ft². With 10% waste, 463 ft² ÷ 32 = 14.5, so 15 sheets. Mud: 421 × 0.009 = 3.8 gal → 1 bucket. Tape: 211 ft. Screws: 480.

Which thickness where

LocationThicknessReason
Walls, standard1/2 inCode minimum in most areas
Ceilings, 16 in joists1/2 inSag risk is low at 16 in
Ceilings, 24 in joists5/8 inPrevents sag between joists
Garage / fire separation5/8 in Type XFire rating
Bathrooms, wet walls1/2 in moisture-resistantPaper face resists humidity

Frequently asked

Do I hang the ceiling first?

Yes. Ceiling sheets go up first so the wall sheets can support their edges, which is what keeps the ceiling joints from cracking.

How many coats of mud?

Three: tape coat, fill coat, finish coat. The calculator assumes that standard, which is where the 0.009 gal/ft² figure comes from.

Should I subtract the door opening?

Yes for material, no for hanging. The opening is covered by a sheet that gets cut out, but you still buy that square footage — which is why waste is set to 10% rather than 5% in rooms with several openings.