How the calculation works

area = length × width

Add waste, divide by the roll size, round up. A pallet is normally 500 ft² — 50 rolls of 10 ft² — which is the unit most suppliers quote.

Worked example

40 × 30 ft = 1,200 ft². With 5% waste, 1,260 ft². In 10 ft² rolls: 126 rolls, or about 2.4 pallets.

What the calculator cannot tell you

Sod fails for reasons that have nothing to do with quantity: dry soil under the roll, no contact between sod and ground, and irrigation that starts too late. The prep matters more than the count.

StepTarget
Soil pH6.0–7.0 for most cool-season grasses
Organic matter3–5% tilled into the top 4 in
Grade2% slope away from the foundation
WaterSoak the soil 24 h before laying, then daily for 2 weeks

Frequently asked

How fast do I have to lay it?

Within 24–48 hours of delivery. Stacked sod heats up and the middle of the pallet dies first.

Do I need topsoil under the sod?

You need loose, amended soil to a depth of 4–6 inches. Sod roots into what is there, not into what you wish was there.

How much extra should I order?

Five percent for a rectangle, ten for a lawn with curves, beds cut into it, or a lot of tree wells.